Camp Meeker Branched Drain Graywater

This passive graywater disposal system was done to avoid/delay redoing this clients septic system, which was a redwood tank. The It included a separate experimental system for kitchen sink water (not legal in California) that later had to be rebuilt because the pipes clogged with food debris. The pipes were 1.5” ABS which was too small, a kitchen system should always be 2” minimum.

  • Client – Private owner

  • Location –Camp Meeker, CA

  • Role in the Project- Design/build/maintain.

2012

Previous
Previous

Rainwater Workshop and Tour

Next
Next

Glenwood Laundry to Landscape